HAFA and FABA Project

  • Widening and Strengthening of existing Two-Lane carriageway to Four Lanes with paved side shoulders of Harike – Zira – Faridkot section of NH-15 (New NH No. 54) from existing Km. from existing Km. 166.925 to 221.380 of NH-15 including construction of Zira, Talwandi and Mudki Bypasses in the State of Punjab on EPC Mode under NHDP-IV for a total Length of 54.46 Kms and a Contract value of Rs 611.07 Crores
  • Widening and Strengthening of existing Two-Lane carriageway to Four Lanes with paved side shoulders of Faridkot-Kotkapura-Bathinda Section of NH-15 (New NH No. 54) from existing Km. 221.380 to 287.615 of NH-15 including construction of Faridkot-Kotkapura bypass in the State of Punjab on EPC mode under NHDP-IV for a total length of 61.62 Kms and a Contract Value of Rs 597.07 Crores